Connection up to 20 kW
Unit price
0,00 €
The stand rental fee already includes the costs of electrical connections (3 kW to 130 kW) as well as the installation costs for each connection or connection point. The electrical stand installation is not included in these services.
The additional cost for installation on the stand will be charged against the warranty amount.
Please upload a layout of your stand under Dashboard > Summary of my orders and quotations > Attachments to my services in our shop after completing your order.
Downloads and links
Purchase order terms for category Electricity supply
You can have your connection point relocated above floor level to anywhere on your stand at no extra charge. Please indicate the desired location for the connection point on an attached sketch of your stand.
Depending on the power rating you have ordered, your connection points up to 40 KW will be delivered in the form of flexible cables with a 5-pole CEE plug-in connector for 16 A (10 kW), 32 A ( 20 kW), 63 A (40 kW), 125 A (68 kW).
Safety
For all electrical installations and equipment that exhibitors intend to operate at their stands using the mains power supply, an Installation Certificate must be submitted by the electrical technician who performed the installation work, together with a copy of the technician's certificate of qualification to perform such work. Test logs in accordance with German accident prevention regulation DGUV3 must be generated and supplied on request. The power supply to the stand will not be activated until these requirements have been met.
If you intend to install your own distribution at the electrical connections of the stand, it is mandatory that the distribution are equipped with a functional residual current devices (RCDs) with a nominal fault current of up to a maximum of 30 mA. Alternatively, you can rent a distribution solution from Deutsche Messe. Please also observe the Technical Regulations of Deutsche Messe.
After providing the required documentation, an authorized electrician commissioned by Deutsche Messe will carry out a visual and functional inspection free of charge.
Sketch of stand
In order to be able to provide an offer as well as to carry out the electrical work it is necessary that you submit a sketch of the installation you want.
Further information regarding the electricity supply can be found in the Technical regulations, item 5.3
The General Commissariat and the Deutsche Messe bare no liability whatsoever for damages resulting from faults in the electricity supply network, unless these can be attributed to the wilful intent or the gross negligence of the General Commissariat, Deutsche Messe or one of their agents.
Pricing terms for category Electricity supply
Unless otherwise stated, prices are net prices plus statutory VAT.
Only the prices shown on the order form or order screen on the day of the order apply. These are also listed in the confirmation of receipt of the order, which the exhibitor automatically receives immediately after placing his order.
The additional cost for installation on the stand will be charged against the warranty amount.
A 10% surcharge will be added to the price of installation services for orders received after expiration of the order deadline.
Cancellation terms for category Electricity supply
More products from Technical services and logistics
More products from Technical services and logistics
There are no other similar services at this time.